KEMISIM supports operators and service companies running hydraulic fracturing design programs in Abu Dhabi with physics-based design software, training and engineering consulting.
Hydraulic fracturing design is the engineering workflow that selects fluid, proppant, rate and stage geometry to create propped fractures of the right length, conductivity and complexity for a target reservoir — balancing production gain against cost and risk. For operators working in and around Abu Dhabi, the technique is shaped by local reservoir mineralogy, completion practice and the service-company spreads available out of United Arab Emirates.
KEMISIM Fracturing Software simulates fracture initiation, propagation and proppant transport with calibrated geomechanics — letting engineers screen designs in hours instead of weeks. Teams based in Abu Dhabi can engage KEMISIM remotely or through on-site engineering support, with project delivery aligned to local operator workflows.
Abu Dhabi anchors UAE upstream activity, with ADNOC operating onshore, offshore and unconventional assets across the emirate. KEMISIM's engineering team has supported hydraulic fracturing design projects across UAE and structures every engagement around defensible, audit-ready engineering.
Yes. KEMISIM works with both operators and service companies in Abu Dhabi and across UAE, delivering design, training and post-job evaluation for hydraulic fracturing design programs.
Both. Engagements range from single-well design reviews to multi-year field campaigns covering hundreds of wells.
A typical pilot design — covering one well and one scenario — can be delivered within 2–4 weeks of receiving the data package.
Yes. KEMISIM provides on-site engineering and training in Abu Dhabi and across UAE as part of larger engagements.
A KEMISIM engineer will walk you through the workflow on data that looks like yours — no slides, no generic decks.