/ Well Integrity · Primary & Remedial Cementing

Cementing design software for zonal isolation and long-term well integrity.

Plan primary and remedial cement jobs with displacement physics, slurry rheology and centralization analysis built for HSE-critical wells in the Middle East, Asia and Africa.

/ The problem

Poor cement jobs become decades of intervention cost.

Channeling, contamination and inadequate displacement create remedial cementing campaigns, lost isolation, sustained casing pressure and serious integrity exposure for years after spud.

  • 01Mud channels remain along low-side of deviated wells
  • 02Poor centralization in tortuous trajectories
  • 03Slurry incompatibility with displaced fluids
  • 04ECD spikes risking losses or formation breakdown
  • 05Inadequate planning for foamed or lightweight systems
/ The solution

Cement jobs designed against physics, not templates.

KEMISIM Cementing Software models the full job — from mud removal through slurry placement and WOC — so engineers commit to designs they can defend technically and operationally.

01
Displacement-efficiency simulation in deviated wells
02
Slurry rheology and density hierarchy design
03
Centralizer placement and standoff optimization
04
ECD, surge and swab analysis
05
Lightweight, foamed and reactive systems
06
Remedial / squeeze cementing planning
07
Wellbore integrity screening
/ Engineering workflow

From problem to defendable engineering decision.

01
Wellbore model

Trajectory, casing program and fluids built into a coupled hydraulics model.

02
Slurry & spacer design

Rheology, compatibility and density steps designed for stable displacement.

03
Placement simulation

Displacement efficiency, ECD and free-fall predicted and optimized.

04
Field execution & QC

Operational parameters delivered as a defensible job program.

/ Return on engineering

Fewer remedial jobs. Cleaner barrier logs. Lower lifecycle cost.

Better cement design pays back across the whole life of the well by eliminating reactive interventions and unplanned isolation work.

−40%
Remedial cementing scope on follow-on wells
+20%
First-time barrier-log pass rate
−30%
Non-productive time linked to cement issues
Indicative ranges from comparable field operations. Field-specific outcomes confirmed during the demo.
/ Capabilities

Built by engineers for engineers.

Designed for:

  • Drilling & completions engineers
  • Cementing service-company designers
  • Well integrity teams
  • HSE / barrier-management groups
01Primary & remedial cementing modules
02Displacement efficiency in deviated wells
03Centralizer placement optimizer
04Slurry rheology & compatibility design
05ECD, surge & swab analysis
06Foamed / lightweight system support
07Job QC and post-job evaluation
08Integrity-risk screening
/ Trusted by leading operators

Engineering software supporting operators across the Middle East, Asia, Europe and Africa.

North Oil Company logo
Oil India logo
DONG Energy logo
Noreco logo
IWSS — Integrated Well Services & Solutions logo
/ Questions engineers ask

Frequently asked questions.

+Does it model deviated and horizontal wells?

Yes. Trajectory, eccentricity and standoff are explicit inputs to the displacement calculation.

+Can I design squeeze and remedial jobs?

Yes. Dedicated workflows cover squeeze cementing and plug-back operations.

+Is foamed cement supported?

Yes. Foamed and lightweight systems are modeled with their density and rheology evolution.

/ Talk to engineering

See KEMISIM Cementing Software on your reservoir.

A KEMISIM engineer will walk you through the workflow on data that looks like yours — no slides, no generic decks.

Direct line: +971 55 219 9323 · +971 50 441 1628
/ Resources for this software

Engineering reading & tools

/ Explore the platform

Related engineering software