/ Well Intervention · Coiled Tubing

Coiled tubing analysis and modeling software for safe, optimized interventions.

Plan and de-risk coiled-tubing interventions — tubing forces, lock-up, hydraulics, fatigue and N₂ requirements — with one engineering platform for service companies and operators.

/ The problem

A stuck CT string is a six-figure problem on a good day.

Coiled tubing operations carry real mechanical and operational risk. Reach limitations, lock-up, fatigue and inadequate hydraulics convert into NPT, fish jobs and HSE exposure.

  • 01Reach and lock-up estimated, not engineered
  • 02Fatigue tracking inconsistent across service jobs
  • 03Hydraulics and N₂ design done in isolation from forces
  • 04Job programs not stress-tested before mobilization
  • 05Lessons from previous runs not carried forward
/ The solution

One platform for CT engineering, from job plan to post-job report.

KEMISIM Coiled Tubing Analysis Software couples tubing-force modeling, hydraulics and fatigue tracking into a single workflow — so CT programs are technically sound before the unit is on location.

01
Tubing-forces and lock-up analysis
02
Hydraulics and circulation modeling
03
N₂ requirement and lift design
04
Fatigue tracking across runs
05
Reach and weight prediction
06
Job programs and post-job reports
07
Sensitivity to deviation, friction and BHA
/ Engineering workflow

From problem to defendable engineering decision.

01
Well & CT setup

Trajectory, BHA, fluids and CT string assembled into one model.

02
Forces & reach

Helical buckling, lock-up and weight-on-bit predicted across the run.

03
Hydraulics & N₂

Circulation, friction pressure and lift gas requirements designed.

04
Job program & QC

Defendable program issued and post-job actuals fed back to fatigue records.

/ Return on engineering

Fewer stuck strings. Smaller HSE exposure. Better unit utilization.

Engineering rigor at the planning stage saves materially more than it costs across an annual CT campaign.

−60%
Risk of lock-up and stuck-string events
−25%
Non-productive time on CT campaigns
+15%
CT unit utilization through faster planning
Indicative ranges from comparable field operations. Field-specific outcomes confirmed during the demo.
/ Capabilities

Built by engineers for engineers.

Designed for:

  • Coiled tubing engineers
  • Well intervention planners
  • Service-company CT design groups
  • Operator intervention teams
01Tubing-force and lock-up analysis
02Helical buckling models
03Hydraulics and friction-pressure
04N₂ requirement design
05Fatigue tracking across runs
06Reach and weight prediction
07Job programs and post-job reports
08Sensitivity workflows
/ Trusted by leading operators

Engineering software supporting operators across the Middle East, Asia, Europe and Africa.

North Oil Company logo
Oil India logo
DONG Energy logo
Noreco logo
IWSS — Integrated Well Services & Solutions logo
/ Questions engineers ask

Frequently asked questions.

+Does it track CT fatigue across runs?

Yes. Cumulative fatigue is tracked per string and per joint, with re-spool and cut-off recommendations.

+Can hydraulics and forces be designed together?

Yes. Friction pressure, circulation and forces share the same wellbore and fluid model.

+Is N₂ lifting supported?

Yes. N₂ requirements for kick-off, clean-out and unloading are designed in the same workflow.

/ Talk to engineering

See KEMISIM Coiled Tubing Analysis Software on your reservoir.

A KEMISIM engineer will walk you through the workflow on data that looks like yours — no slides, no generic decks.

Direct line: +971 55 219 9323 · +971 50 441 1628
/ Explore the platform

Related engineering software