
Plan and de-risk coiled-tubing interventions — tubing forces, lock-up, hydraulics, fatigue and N₂ requirements — with one engineering platform for service companies and operators.
Coiled tubing operations carry real mechanical and operational risk. Reach limitations, lock-up, fatigue and inadequate hydraulics convert into NPT, fish jobs and HSE exposure.
KEMISIM Coiled Tubing Analysis Software couples tubing-force modeling, hydraulics and fatigue tracking into a single workflow — so CT programs are technically sound before the unit is on location.
Trajectory, BHA, fluids and CT string assembled into one model.
Helical buckling, lock-up and weight-on-bit predicted across the run.
Circulation, friction pressure and lift gas requirements designed.
Defendable program issued and post-job actuals fed back to fatigue records.
Engineering rigor at the planning stage saves materially more than it costs across an annual CT campaign.
Designed for:





Yes. Cumulative fatigue is tracked per string and per joint, with re-spool and cut-off recommendations.
Yes. Friction pressure, circulation and forces share the same wellbore and fluid model.
Yes. N₂ requirements for kick-off, clean-out and unloading are designed in the same workflow.
A KEMISIM engineer will walk you through the workflow on data that looks like yours — no slides, no generic decks.